info@makinailan.com
makinailan
TR|EN Login Sign Up Post Listing
Wood Processing Machines
Metal Processing Machines
Construction Machines
Food Processing Machines
Plastic Processing Machines
All Categories
Blog / Buying Guides

What to Watch for When Buying a Used Tower Crane?

Makina İlan Team · 07.07.2026
What to Watch for When Buying a Used Tower Crane?

Mast-jib sections, rope-hook, electrics-brakes and assembly: safety and documentation in a tower crane.

Short answer: On a tower crane, safety comes before everything: cracks/welds/corrosion on the mast and jib sections, the condition of bolts/connection elements, rope-hook wear and the functioning of brake-limit systems. Is the full section set (mast pieces, connection elements, counterweights) complete? Periodic inspection and assembly/disassembly service are part of the purchase cost.

This guide answers: How many meters/tons of tower crane are needed? · How is section safety assessed? · How is set completeness checked? · What is the assembly cost?

📌 Key facts
  • Section cracking/corrosion and bolt condition are the most serious safety item
  • Set completeness (section + connection + counterweight) is verified before purchase
  • A crane is not bought without a working load/moment limiter and brakes
  • Assembly/disassembly cost is included in the purchase budget
Source: makinailan.com listing data and field practice — free to quote with the "makinailan.com data" attribution.

Mast and jib structure

Cracks, corrosion and deformed bolt holes in the sections are a critical safety risk. Have under the paint and the weld seams inspected.

Rope, hook and brakes

Broken wires and crushing on the hoist/trolley rope; throat opening on the hook; the hoist and slewing brakes plus the load/moment limiter must work.

Set completeness and documentation

Are the mast sections, connection pins/bolts and counterweights complete? Are there a periodic inspection report and an assembly manual? Sourcing missing parts is expensive and time-consuming.

Frequently asked questions

How many meters/tons of tower crane are needed? Site height, reach radius and tip load are chosen together; the load chart is the basis.

Is assembly included? Tower crane assembly/disassembly needs expertise and crane support; add this cost to the price.

For the current price range: valuation tool · listings for sale · cost calculators

Last updated: 07.07.2026 · Based on field practice and platform data; it does not replace a technical inspection.

Comments

No comments yet. Be the first to comment.

Write a Comment

Your comment will be published after approval.

Related Guides

Do you have machinery to sell?

Posting is free — buyer messages come straight to you, no commission.

Post a free listing Why sell here?